Back / Office / Office Furniture / Gaming Chairs / SKU:921-838V00WT
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-1)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-2)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-3)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-4)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-5)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-6)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-7)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White(m-8)
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White
Loading...
FATHER'S DAY SALE

HOMCOM Office Chair with Petal Design, Bow Cushion, Softly Padded, White

Shipped by Aosom Ireland
€156.99
RRP €189.99 17% Off
You Save: €33.00
Select: White, 66cm x 62cm x 88cm
Insufficient stock
Please select 1 or more
With this product, you earn 157 loyalty point(s). 157 points = €1.57.
to earn 157 loyalty point(s) with this product.
Free shipping
Free shipping
Delivery guarantee
Delivery guarantee
Secure Payment
Secure Payment
Security and product resources
Security and product resources

Highlights

  • Unique back design: With its tub-like structure and flowing lines, this computer chair resembles a blooming lotus or an ornate shell, finished with a fashionable bow cushion. Its refined style will surely impress your guests.
  • Spacious comfort: The 54 cm wide seat offers ample room to relax. The generous backrest of the swivel chair conforms comfortably to the body, while the 10 cm thick seat pad of high-density foam and the lumbar cushion ensure lasting comfort.
  • Adjustable relaxation: Personalize your comfort with the height-adjustable seat from 46 cm to 54 cm. Tilt the work chair back to relax and relieve your back. The 360° swivel seat and casters support effortless movement and efficient multitasking.
  • More than an office chair: Featuring a high-quality velvet cover, an exceptional back design and a chic white base, this chair works perfectly as a makeup chair, adding a touch of elegance to your vanity area and creating an inviting atmosphere.
  • Product information: Overall dimensions: 66B x 62T x 80-88H cm. Seat size: 54B x 49T cm. Assembly required.
Brand HOMCOM
SKU 921-838V00WT
Package QTY 1

Return & refunds

Wholesale demand

Product Details

Make your house, home. Fusing classic designs and innovative features, and made with the every day in mind, our carefully-curated HOMCOM collection for your living space is just what you’ve been searching for. Discover comfortable seating, spacious storage, essential fitness, bathroom mirrors, TV stands and much more in our online shop.

Experience the charm of HOMCOM's compact office chair that combines elegance and comfort. The unique petal-shaped back design evokes a blooming lotus flower and a scallop shell, complemented by a bow cushion for an enchanting style. The comfortable desk chair with a wide, armless seat and thick, high-density foam cushions ensures pleasant seating. Adjustable height and swivel increase the flexibility of your home workspace or makeup area.

Features:

  • Petal-shell back design with bow cushion enhances aesthetic appeal
  • 54 cm wide armless seat allows unrestricted seating
  • Thickly padded cushions with high-density foam and lumbar cushion for prolonged sitting
  • Seat height adjustable from 46 cm to 54 cm for personalized comfort
  • Tilt function to recline for extra relaxation
  • 360-degree swivel seat and casters enable efficient multitasking
  • Velvet-like fabric feels luxurious, is skin-friendly and breathable
  • Assembly required

Specification:

  • Color: White
  • Material: Velvet (100% Polyester), Foam, Nylon
  • Overall dimensions: 66B x 62T x 80-88H cm
  • Seat size: 54B x 49T cm
  • Seat height: 46-54 cm
  • Seat thickness: 10 cm
  • Back height: 36 cm
  • Cushion dimensions: 36B x 12T x 25H cm
  • Load capacity: 120 kg

Package Includes:

  • 1 x Office chair
  • 1 x Manual

Community Q & A (0)

Ask a Question
Name*
Question*
0/200
Q&A Tips & Guidelines
Cancel
Shop by customer photos

Your Browsing History

Save With Bundle
0 of 5 items
Service guarantee
Free shipping
All orders placed on Aosom.ie come with free standard delivery for all orders with a valid Irish address.
Delivery guarantee
We understand the importance of receiving your orders on time. If your product arrives later than our promised delivery window, we want to make it right. As a token of our appreciation for your patience, we will offer you an additional discount on your next order.
For more details, click here.

Fill out the application form, click here.
Secure Payment
Security and product resources
pictures and contacts
Product Safety Images
Manufacturer information
EU Responsible Person
Product Safety Images
Product Safety Images is currently unavailable. We are working to include this information in the near future. Please check back for updates.
Manufacturer information
The production information includes the address and related information of the product's manufacturer.
Aosom Ireland Limited
Unit 605, Jordanstown Road, Greenogue Business Park, Rathcoole, Dublin, D24 P08H
+353015568500 service@aosom.ie
EU Responsible Person
EU-based economic operator ensuring the product's compliance with the required regulations.
Aosom Ireland Limited
Unit 605, Jordanstown Road, Greenogue Business Park, Rathcoole, Dublin, D24 P08H
+353015568500 service@aosom.ie